About Products Projects Industries Humanitarian Services Events
Turn-key Office Mobilization
Projects /Oil, Gas & Energy

Turn-key Office Mobilization

2026 Completed
Scroll
"

UCC Qatar Thermal Power Station Support Facility A turnkey modular site facility engineered to support UCC Qatar’s thermal power station rehabilitation project. Designed for rapid deployment in industrial environments, this complex features fully fitted administrative offices, executive conference rooms, dining areas, and advanced site infrastructure—including hybrid solar power systems, shaded parking bays, and independent water and power utilities.

Developed specifically for UCC Qatar as an operational hub during the major rehabilitation works of a thermal power station, this modular site facility offers a fully integrated, high-performance environment for project managers, engineers, and site teams. Built by AWAD Caravans, the project seamlessly combines durable prefabricated construction with modern office comfort and reliable off-grid utility infrastructure.

Key Operational & Infrastructure Highlights

  • Integrated Workspace Solutions: Designed with long, well-lit central corridors connecting executive offices, multi-person workstations, fully equipped meeting rooms, and dedicated dining and kitchen areas.

  • Hybrid Solar & Power Systems: Features advanced inverter and battery storage units alongside heavy-duty backup generators to ensure uninterrupted, energy-efficient power distribution across the site.

  • Turnkey Site Civil Works: Comprehensive site preparation including asphalt access roads, perimeter security fencing, covered vehicle parking shades, high-mast CCTV monitoring, and elevated water storage tanks.

  • Industrial-Grade Construction: Engineered with high-density insulated sandwich panels, heavy-duty window blinds, split AC climate control, and low-maintenance interior finishes built to withstand demanding industrial site conditions.

THE
DETAILS

Client
UCC
Sector
Oil, Gas & Energy
Completion
August 2026
Status
Completed

ENGINEERING
NOTES

01

Solar & Hybrid Power Systems

Equipped with solar panel arrays, advanced inverters, and battery storage to deliver clean, uninterrupted energy and reduce reliance on generators.

02

Complete Civil & Paving Works

Includes full ground preparation, asphalt road paving, and dedicated shaded parking bays to ensure smooth vehicle access and site logistics.

03

Integrated Administrative Hub

Features connected corridors leading to private offices, large conference rooms, kitchens, and dining spaces tailored for large project teams.

04

Off-Grid Utility Infrastructure

Built with elevated water tank towers and heavy-duty power backup units to guarantee full operational independence on industrial sites.

05

Advanced Site Security

Integrated perimeter fencing, warning signage, and high-mast CCTV monitoring systems to maintain strict safety and access control.

PROJECT
TIMELINE

Ground excavation, soil compaction, and full asphalt road paving along with shaded parking area installation.
Erection of elevated water tank towers, integration of hybrid solar panel systems, and high-mast CCTV security poles.
Positioning and assembly of prefabricated sandwich panel caravans, interconnecting offices, conference rooms, and central corridors.
Complete interior furniture setup, HVAC climate control testing, power grid sync, and final facility handover to UCC Qatar.

MEASURABLE
RESULTS

0kW
Solar Power Output
0m²
Paved Road Surface
0Staff
Workstation Capacity
0Cars
Shaded Parking Bays
Interested in a similar deployment for your organization?
Request a Quote →
Interested in a similar deployment for your organization?
Request a Quote →